How It Works
Build it once.
It runs every period.
ControlClose turns your team’s workbook into a workpaper: your logic as code, checked cell by cell against your numbers and approved by you. Then it runs every period on data that’s been checked and signed off first. An agent prepares each task, and a person signs off. Same inputs, same version, same result.
Your close, one signed-off hand-off at a time
Your data
last period’s gold copies · this period’s activity from your systems and reports
Checked, then run
Data checks
gold copies ↓
Workpapers
Your checklist
- Sign off contract registerFinal
Legal prepares · Controller reviews
- Deferred revenue scheduleIn review
Agent prepares · Rev. lead reviews
- Early renewal adjustmentIn review
Agent prepares · Controller reviews
- Payroll accrualFinal
Payroll prepares · Controller reviews
- Tie out to the ledgerBlocked
Blocked by Contract register
A task stays blocked until the gold copy it needs is final.
Getting there
From your workbook to a workpaper that runs, in three steps.
Start with the workpaper that takes longest to get working each period. You build it once, then it runs every close. The rest of your checklist stays on the same list as manual tasks until you convert them.
Bring your workbook
Upload the workbook and one period’s data. An agent builds the workpaper as code and checks every cell against your saved values.
Approve and assign
Approve the plan and the decisions the build raised. Tasks open on the checklist with a named owner and reviewer: an agent prepares, a person signs off.
Run every period
The data lands and is checked, the workpaper runs, the agent writes the preparer’s note, a person signs off, and the next task unblocks.
Where teams start
The work your billing stack leaves behind.
Each of these runs as code every period. Your team reviews what the checks flag, not the whole workbook.
Gateway reconciliations
Workpaper
Ties billing, payment gateways and the bank, record by record
You review
The exception list, sized by impact. See an example
Usage and overage true-ups
Workpaper
Pulls usage and billed amounts, computes the accrual and the true-up
You review
Variances over your threshold
Early renewals and modifications
Workpaper
Finds the contract changes your systems never saw and computes the adjustment
You review
The entry and its support
Non-standard contracts
Workpaper
Matches deal desk terms to billing and applies your policy
You review
Contracts the rules can’t place
SSP and percent complete
Workpaper
Allocates SSP with professional services in the mix and applies percent complete
You review
The allocation, with the services lead’s input on record
Cut-off checks
Workpaper
Tests every invoice and usage record against the period
You review
Records that landed in the wrong period
One period
What happens each period.
Every period runs the same four steps. Nothing is calculated on data that hasn’t been signed off, and nothing downstream runs until the output it needs is signed off.
This period’s inputs arrive
Upload a file or a report, or let a taught download run. Last period’s signed-off outputs are already there. Each input is checked on arrival, and the task waits until everything is in.
Upload · report · taught download · last period carried forward
The data is checked and signed off
Checks tag the data and flag the rows that need a person. A reviewer signs it off, and only that signed-off copy is what the workpaper reads.
Tag · flag for review · sign off
The workpaper runs, and an agent prepares
Each step runs in order as code, with no model in the calculation. Checks pass, warn or fail. The preparer agent writes the note, citing tabs, cells and checks, and routes it to the reviewer.
Versioned workpaper · named checks · Excel with formulas
A person signs off, and the output moves on
The reviewer opens the workbook, asks questions in the thread, and approves or sends it back. Sign-off makes the output a gold copy: the signed-off version the next task reads. The audit log records who did what, and when.
Gold copy · next task unblocked · audit log
Data in → Signed off → Run and prepare → Sign-off, every period.
The Shift
From rebuilding to running.
The outcome
The close is a review, not a rebuild.
When data is signed off before it’s used and the workpaper does the calculation, your team’s time goes to flagged rows, failed checks and the calls only a person can make.
Every number traces to a tab and a cell, and every hand-off is a signed-off gold copy. Your auditor opens any period’s workpaper in Excel, with the data as it stood at close.
See it on your workpaper.
Bring the workpaper and one period’s data. We’ll build it as code in front of you and show you where it ties.
Book a working session